Project

Gldani Swimming Pool, Tbilisi

Completed

Client:Educational and Scientific Infrastructure Development Agency LEPL

Start date:Dec 2011
Completion date:Oct 2012
Total Area: 5100 m2

Project Description


Building with 3 swimming pools and 3 saunas is designed with full framed structural diagram. Its reinforced concrete load-bearing elements are simple, flat platelike and bar elements. Internal engineering networks were arranged with its plants and equipment and pool cleaning systems. Internal roads with asphalt covering were arranged. Grounds were paved with decorative concrete tiles.

Foundations – monolithic reinforced concrete bored piles with diameter 600 mm, on which monolithic reinforced concrete foundation slab is arranged.
Roof – flat metal trusses with span 30 m.
Rooftop – metal corrugated deck on metal longitudinal girders.
Walls – small concrete masonry bocks.
Windows and glass panels – aluminum profiles, double-pane insulated windows.
Façade finishing – Alucobond façade system.