Project

Audi Center, Tbilisi

Completed

Client:Iberia Auto House LTD

Start date:Oct 2013
Completion date:Oct 2014
Total Area: 1820 m2

Project Description

According to its framed structural diagram building represents complex of the monolithic reinforced concrete structures and factory-made fabricated steel structure, the so called Orsk with span 24 m. Reinforced concrete load-bearing elements of the building are arranged from flat platelike and bar elements.Main façade walls are cladded with perforated Alucobond panel façade system.  

Foundations – monolithic reinforced concrete slab.
Internal walls – small concrete masonry blocks.
Façade walls – metal sandwich panels.
Doors, windows and glass panels – aluminum profiles, double-pane insulated windows.