Project

Rcheuli Villa, Batumi

Completed

Client:Natural Person

Start date:Apr 2007
Completion date:Sep 2007
Number of Rooms: 10
4-floor building with semi-basement has been designed with the full framed structure. Reinforced concrete load-bearing frame is decided with the simple, flat platelike and bar elements. Full-scale finishing works have been executed in the interior and in internal rooms with the installation of MEP systems.

Foundations – strip foundations from monolithic reinforced concrete.
Walls and partitions – small concrete masonry blocks.
Roof – copper sheets on wooden rafter system with lathing.
Doors and windows – metal-plastic profiles, double-pane insulated windows.
Façade finishing – decorative plaster from sand-cement mortar, architectural details and ornaments.
Walls of socle and external stairs – cladding with natural granite tiles.