Project

Georgia Palace, Kobuleti

Completed

Client:Coca-Cola Bottlers Georgia LTD

Start date:Feb 2006
Completion date:Oct 2008
Number of Rooms: 157
The 7-floor building is designed with a full framed structural diagram. Its reinforced concrete load-bearing elements are simple, flat platelike, and straight bar elements. The hotel complex has a stand-alone indoor swimming pool, conference hall, and sauna; an open swimming pool was arranged in the yard with an area of 250 m2. The yard was paved with decorative concrete tiles, curbs were arranged and landscaping was carried out. 3 pcs. passenger elevators by Kone are installed inside the building.

Foundations – monolithic reinforced concrete beam slab which is arranged on the artificial substructure from the sand-gravel mix.
Walls and partitions – small concrete masonry blocks.
Doors, windows, and glass panels – aluminum profiles, double-pane insulated windows.
Interior door blocks – laminated MDF panels.
Façade finishing – sand-cement mortar, façade paint.
Roof – thermal insulation, soft waterproofing rolled material.