Project

Georgia Palace Hotel, Kobuleti

Completed

Client:Coca-Cola Bottlers Georgia LTD

Start date:Feb 2006
Completion date:Oct 2008
Number of Rooms: 157

Project Description


7-floor building is designed with full framed structural diagram. Its reinforced concrete load-bearing elements are simple, flat platelike and straight bar elements. Hotel complex has stand-alone indoor swimming pool, conference hall and sauna; open swimming pool was arranged in the yard with area 250 m2. The yard was paved with decorative concrete tiles, kerbs were arranged and landscaping was carried out. 3 psc. passenger elevators by Kone are installed inside building. 

Foundations – monolithic reinforced concrete beam slab which is arranged on the artificial substructure from sand-gravel mix.
Walls and partitions – small concrete masonry blocks.
Doors, windows and glass panels – aluminum profiles, double-pane insulated windows.
Interior door blocks – laminated MDF panels.
Façade finishing – sand-cement mortar, façade paint.
Roof – thermal insulation, soft waterproofing rolled material.